I live in Ballyleague, on the Roscommon side of the bridge at Lanesborough. For most of the last century the Midlands powered Ireland from a few miles up that road. Bord na Móna cut the turf on the Mountdillon bogs, the ESB burned it at Lough Ree, and a whole way of life was organised around that work: the shift patterns, the wages that paid for the extension and the car and the school books, the clubs and the shops that lived off those wages. From Lanesborough to Shannonbridge, Rhode to Coill Dubh, Kilcormac to Walsh Island, the same story repeated itself across four counties. I reported on those communities for 26 years as RTÉ’s Midlands Correspondent, and I know hundreds of the people whose jobs went.

That is why I do not treat the just transition as a file. It is the reason I ran for Europe, and it is the work I most want to be judged on.

A promise made in Brussels, tested in Offaly

When the European Union adopted the Green Deal, it made a promise alongside it: that nobody would be left behind. Regions that had carried the carbon-intensive work of Europe for generations would not simply be told the work was over. There would be money, time and planning. The was the instrument built to deliver that promise, and the Midlands of Ireland was one of the places it was meant for.

The promise was right. The delivery was not. The West Offaly and Lough Ree power stations closed, Bord na Móna wound down peat harvesting, and the industrial spine of the region was removed in the space of two or three years. Lough Ree Power Station cost more than €200 million, opened in 2005 and shut in December 2020 after just fifteen years. Lanesborough and Ballyleague alone have lost more than 800 jobs in recent years. Between 1970 and 2020, more than a thousand people worked at the Blackwater works and the West Offaly power station outside Shannonbridge.

Two or three years, when others got decades

Compare that with how the same change was handled elsewhere. In Silesia, in Poland, coal workers negotiated a transition with protections running to 2049. Almost thirty years of notice. In the Irish Midlands, the effective notice period was measured in months for many families, and the announcement and the closure were close enough together that people had no time to retrain, no time to move, no time to plan anything at all.

ExplainedA transition without the timeHow long communities were given to adjust
Irish Midlands: peat and power closures2–3 years
Poland: coal-region transition plansto 2049
1,000jobs lost in the Midlands in two to three years

Sources: ciaranmullooly.com, May 2025; Eolas Magazine, September 2025.

I am not arguing that the bogs should have stayed open forever. The science is the science, and most of the men I know who worked on them would tell you the same. What I am arguing is that speed is a policy choice, and that the speed chosen here was not just. A transition that gives one region thirty years and another region three is not a transition. It is a closure with a nicer name on it.

“Nobody left behind” was the promise. In the Midlands we found out that a promise without money, time and a local office behind it is only a sentence in a document.

What the fund is, and what it can and cannot do

It is worth being straight about the mechanism, because a lot of frustration comes from expecting the wrong thing. The Just Transition Fund is European money, allocated to a member state, matched with national money, and then delivered through national and regional bodies. Ireland was allocated around €169 million for the Midlands until 2027, alongside Government match funding. Brussels does not open a grant office in Ferbane. It sets the rules and writes the cheque; Dublin, the regional assembly, Pobal, Fáilte Ireland and the county councils decide who actually gets it.

ExplainedHow Just Transition money reaches communitiesIreland’s Just Transition Fund to 2027
EU JTF€169m + matchRegional AssemblyEastern & MidlandPobalcommunityFáilte IrelandtourismCouncilsSTART €30mYour communityjobs · skills · hubs

Ciaran’s report: pre-finance up to 90% for low-risk groups, local grant managers, and a stand-alone JTF 2.0 after 2027.

Sources: Westmeath Independent, 4 July 2025; Offaly Express, 25 February 2026.

That matters for two reasons. First, when the money is slow, the blame is usually shared, and pretending otherwise helps nobody. Second, it means an MEP has two jobs, not one. In Brussels I can change the rules: the size of the fund, how far in advance groups can be paid, who has to be consulted. At home I can only do what any advocate can do, which is to push councils, agencies and Ministers to use what is already there before the clock runs out.

The clock is the cruellest part of it. Complex applications, short timelines, match-funding requirements and low awareness meant that money sat unspent while the people it was meant for were emigrating or commuting. By late 2024 I was telling the Cohesion Commissioner, Elisa Ferreira, in Strasbourg that Ireland had drawn down only 5.4% of its cohesion allocation, and that the complexity described to me by regional authorities was the reason why. Around €40 million of Just Transition money was sitting unspent because of red tape. A voluntary committee in a village of four hundred people cannot carry a bridging loan for eighteen months while it waits to be reimbursed. That is not a failure of ambition in those communities. It is a design fault in the scheme.

From activator to rapporteur

Before I was ever elected, I was inside this process rather than above it. I volunteered with community groups making applications to the fund, and then worked as a Just Transition Fund activator, helping other groups through the forms, the eligibility tests and the match-funding arithmetic. I know what page people give up on.

In August 2024, six weeks after taking my seat, I ran a community consultation across the Midlands ahead of the Commission’s review of the fund, asking two blunt questions: how many community groups had actually got through the process, and how many former Bord na Móna and ESB workers or their families had benefited from a grant. In October 2024 the European Parliament’s Committee on Regional Development appointed me on the role of cohesion policy in supporting the just transition. A rapporteur writes the Parliament’s report on a subject, negotiates it line by line with the other political groups, and then has to carry it through committee and through a vote of the whole House. It is the one job in the Parliament where a Member from a small delegation can genuinely set the agenda.

I did not write it at a desk. I consulted community groups across the four counties. In February 2025 I brought a delegation of MEPs from across Europe to Kilcormac Development Association in Offaly, so that members from Poland, Slovakia, Portugal and Spain could hear directly from a local committee what it is like to try to create jobs with this fund. The same delegation travelled west, where they backed a feasibility study on reopening the Claremorris–Sligo rail line. I visited transition regions in other member states to see what had worked there and what had not. In May 2025 I published a 29-point plan for changing the fund, and tabled lifeline amendments seeking an extra year of eligibility for Irish projects after Ireland was left out of a one-year extension granted elsewhere.

The Regional Development Committee adopted my report on 4 July 2025. On 10 September 2025, in Strasbourg, more than 400 MEPs voted to adopt it.

What the report actually asks for

The recommendations are deliberately practical. None of them is abstract, and every one of them came from somebody in a hall in the Midlands telling me what had gone wrong for them.

  • A stand-alone, better-funded Just Transition Fund 2.0 after 2027, not a line item folded into a general pot.
  • Pre-financing of up to 90% for low-risk community and voluntary groups, so that no committee has to take out a bridging loan to do work the State has already approved.
  • Special economic zones near former job-loss sites, with targeted investment, tax incentives and faster planning, learning from what Shannon did in 1959 and what Katowice did in 1996.
  • Priority access to state and semi-state land for new employers, because in these communities the State already owns the best-serviced sites.
  • Local grant managers based in the towns and villages themselves, so that the person helping you with the application is somebody you can call in to see.
  • Tailored support for workers over 50, who are the hardest group to place and the easiest group for a scheme to quietly give up on.
  • Apprenticeships and training so that young people have a genuine right to stay, rather than a right to a good reference on the way out.
“Local authorities cannot be brought in at the end of the process and asked to rubber-stamp decisions already made in Dublin. Just Transition cannot be allowed to disappear into a general funding pot.”

The next budget is where this is won or lost

A report adopted by Parliament is a mandate, not a law. The real fight is the EU’s long-term budget for 2028–2034, and the Commission’s proposals for it did not include a stand-alone Just Transition Fund at all. Under the proposed National and Regional Partnership Plans, cohesion money, rural development money and just transition money would be merged into a single plan per member state, negotiated between Brussels and Dublin.

So in June 2026 I tabled amendments to that proposal: to keep a dedicated €7.5 billion Just Transition Fund, to guarantee local and regional authorities a role from the very start rather than at the rubber-stamp stage, and to protect . This is not a technical argument about budget lines. The Northern and Western Region already sits well below the EU average in output per head, with Border areas around 70% of it, and County Galway generating nearly 40% of the region’s output and 58% of its IDA-supported jobs. National averages hide those gaps entirely. If the plan is written to a national average, the Midlands and the North West lose, every time.

In April 2026 I helped bring more than 20 stakeholders from farming, local government, regional development and civil society to two days of talks in Dublin with Executive Vice-President Raffaele Fitto on that budget. Offaly representatives told him what the fund has delivered — one community enterprise reported 35 jobs created — and exactly where state aid rules and match-funding requirements still block them. That is the kind of evidence that changes a text.

On the ground, where it is actually judged

Policy is only as good as what it delivers within walking distance of somebody’s house. In February 2026 I urged Offaly and Laois county councils to move fast on the new €30 million Just Transition START programme, and to hold community meetings in the places that actually lost the work: Shannonbridge, Bracknagh, Kilcormac, Rhode, Clonbullogue and Walsh Island in Offaly; Mountmellick, Clonaslee, Portarlington and Ballyfin in Laois. If strong applications do not go in on time, money set aside for the Midlands transition will be spent somewhere else.

“People need employment and good employment after the loss of peat industry jobs.”

In July 2026 I organised a public meeting in St Mary’s Hall in Lanesborough on giving the Lough Ree site a second life rather than demolishing it, where a prospective investor with Enterprise Ireland backing set out plans that could create more than 100 direct jobs within five years. In August 2026 I held a public meeting in Shannonbridge Community Hall on replacement employment for West Offaly, where a local enterprise presented a proposal for a fire-testing hub for modular buildings on land near the village. I had already written to the Minister asking that community proposals for both stations be considered before the ESB demolishes them, while researchers at TUS in Athlone carried out feasibility work on the Lanesborough site.

And some of it is small and immediate. In February 2026, Transition Year students at St Mel’s College in Longford completed Safe Pass training paid for with Just Transition money, which lets them take up construction apprenticeships. A region that sent its young people to Bord na Móna for three generations can send them into building the houses the country needs. Using this fund to do that is, as I said at the time, a no-brainer.

The argument against me, put fairly

The strongest criticism of everything above is this: the money was there and it was not all spent, so the problem is local capacity, not European rules. There is something in it. Some applications were weak. Some councils moved slowly. Ireland, as a relatively wealthy member state, was never going to get a Silesian-scale allocation, and there is a real question about whether a stand-alone fund for a handful of regions is the best use of a European budget under pressure from defence, enlargement and debt.

My answer is that capacity is created by design. If you write a scheme that requires a bridging loan, a consultant and an eighteen-month wait, you have written a scheme for organisations that already have money, and those are not the organisations in Rhode or Bracknagh. Pre-financing at 90% and a grant manager in the town are not generosity; they are the difference between a fund that works and a fund that returns its money. And on the wider question: if Europe cannot make good on this promise, in a region of a few hundred thousand people, over seven years, then it should stop making the promise.

What happens next

The Parliament’s position on the 2028–2034 budget will be fought out over the coming months and then negotiated with national governments, with Ireland in the chair of the for part of it. I will be defending the stand-alone fund, the €7.5 billion, the role of local authorities and the protection of LEADER at every stage, and I will keep holding public meetings in the places concerned rather than reporting back from a distance.

If you run a community group, a council or a business in a transition county, the most useful thing you can do is get a project on paper now, before the next round opens, and tell my office what stopped you the last time. Every one of the seven recommendations above came from somebody doing exactly that. Justice must come before transition, and it will not arrive on its own.